TDS Update

As of June 20, masons were finishing up their brick work on the north side and have only the annex to do once they finish, and roofers were finishing up their portion of the job installing the parapet trim caps. Curtainwall installers are putting the sun shades on the south glass exposures and should be done with their work in the next couple of weeks. Bathroom tile was scheduled to start last week, and the sheetrock will be done in a couple of weeks. Ceiling grid is being installed on the second floor while cabinets are being installed in the labs. Paint has progressed on the second floor with multiple colors on the walls. The elevator installation commenced last week and should take another few weeks to fully complete. Window operators are being installed while insect screens are going into the windows. Shades should be installed within the next week as well.