The second floor slab is scheduled to be poured Tuesday the 31st, so anticipate plenty of concrete mixing truck traffic on Blake St.

Roofers have about a quarter of the roof covered while electricians have most of the floor boxes installed on the second floor.

Backfilling at the annex is almost complete while electricians ran their underslab conduit to the electrical rooms.

Spray foam insulation is almost complete in the attic of Butterfield, and sink line rough-in has begun on the second floor bathrooms. Speaking of the second floor of Butterfield, framing of the office and bathroom walls is completed, so the space is coming together.