Most of the steel has been erected and the majority of the most recent work has been laying down the metal decking. Plumbers have been able to get back to running roof drains vertically to the roof deck, while running water lines in the attic of Butterfield. Site excavation was scheduled to resume this week to prep the annex area for foundation and steel erection. Once they are finished in that area, the crushed concrete from the Adams Tech foundation will return as fill underneath the first floor slab. New pictures showing the steel going up have been uploaded to the project website.