Commercial Construction
Introduction of the processes of commercial building, including environmental and regulatory factors and analysis of foundation components and structural and enclosure building systems. Lectures, site visits, and projects present students with an array of technical challenges in building design. Focus is on analyzing and designing architectural details for a variety of building materials. Prerequisite: ARCH 260. Spring.
Section: ARCH-270-01
Credits: 4
Faculty: Malcolm R Katz
Days: TR
Times: 9:00AM‑10:45AM (TR)
Start/End Date: 02/15/21 - 05/28/21
Instruction Method: Hybrid
Related Searches:
Register for this Class:
-
Call us at (603) 358-2290
Monday - Friday, 8 a.m. - 5 p.m. -
Visit our office at:
Elliot Hall, First Floor, Suite 144
Keene State College
- Register Online